We are looking for bright & brilliant people to lead and help operational and improvement activities across various mills in Indonesia. Our work involves problem solving and implementation on Production and Engineering issues. You will be exposed quickly to the working environment and the organization of Asia Pulp & Paper and are expected to fill leadership roles as development of your career.
Power Plant Division Head
(All Over Indonesia)
Requirements:
- Candidate must possess at least a Bachelor’s Degree, Engineering (Mechanical) or equivalent
- At least 8 year(s) of working experience in the related field is required for this position
- Preferably Managers specializing in Engineering – Mechanical/Automotive or equivalent
- Having experience in the large capacity power plant comprising of power boilers; chemical recovery boilers and steam turbines; gas turbines and diesel gensets
- Having knowledge in boiler and turbine internals and its preventive maintenance
- Conversant with the project activities of installation of power plant machineries
- Proven track record of commisioning of the new power boiler/steam turbines
- Full-Time positions available.
Potential and interested applicants should email complete resumes in English to:
recruitment_app@app.co.id
Submission is no later than two weeks since this advertisement is posted.
Visit us at: www.asiapulppaper.com
To: HRD Manager / Recruiter
Bontang, Oktober 11, 2010 th
Dear Sir;
I am applying of the vacancy as POWER PLANT DIVISION HEAD on Your Mill Company PT.Indah Kiat Pulp & Paper , that I have heard with fantastic interest.
I was graduated from The Academy of Pulp and Paper Technology ( ATPK ), and I have been working in Power plant 125 MW(2×62.5 MW ) ,PT. Kiani Kertas as Grate stoker Boiler; Turbine Generator , Power distribution & Auxiliary ,Recovery Boiler, Evaporator Operator since May 1996 to January 2004 and since January 2004 as Grate Stoker Boiler, Turbine Generator ,Power Distribution & Auxiliary Shift Supervisor till June 12, 2007 in PT.Kiani Kertas, and (Head ) of Power Plant Dept in PT.Indominco Mandiri-Coal Captive Power Plant ( 2 x 7 MW ) Bontang until now.
As I wish to extend my experience and as the terms indicated in Your advertisement include fascinating prospects of progress and advancement, I hope You consider my application.
Enclosed, please find my Curriculum Vitae.
I would be please to come for an interview any time convenient to you.
Sincerely Yours,
Aen Nurhudin
CURRICULUM VITAE :
Name : Aen Nurhudin
Date of Born : Bandung, August 19, 1973
Sex : Male
Status : Married
Nationality : Indonesian
Religion : Moslem
Address :
Present : PT. Indominco Mandiri
Mill Site Bontang
Power Plant Dept.
Km.33 Tanjung Santan-Bontang
Bontang- 77311
East Kalimantan
Phone : +62 548 26235-Ext.2250
Permanent : Jl. Kedondong Dalam I no.23
Voorfo- Samarinda Ulu
Samarinda 75123
East Kalimantan
Phone Home : (62-541) 734635
HP : (62-81347220521)
Education :
• Was graduated fromThe Academy of Pulp and Paper Technology (ATPK), Bandung on April 1996. I have been awarded a fellowship from Kiani Kertas .PT Bleach Kraft Pulp Mill, East Kalimantan on the last year in ATPK
• Senior High School, 1989-1992.
Training and Experience :
Training:
1. Basic Training Cooperation Between Institute of Research and Development of Cellulose Industry and Kiani Kertas.PT
2. Mechanical Awareness in Samarinda
3. Betz Dearborn water treatment Training
4. Safety Awareness and lock out procedure training in mill site Mangkajang
5. Boiler Operator Training Class 2 on October 2, 1999
6. Boiler Operator Training Class 1 on October 1, 2002
7. Shift Supervisor Training and Work Shop, provided on site Mangkajang August 20 to October 20, 2003 ( Shift Coordinator )
8. Basic Management Training
9. English Courses in LB-LIA Bandung 1995
10. Power Plant Training by Indonesian Power 2007
- Benchmark to Power Gresik ,East Java
- Benchmark to PJB Paiton ,East Java
11. Quality Knowledge Training by HRD , Quality section ( QSE Dept ) Maret 2010
Experience :
1. Recovery Boiler (With 513 T/H Steam capacity, Pressure 62 bar) and Evaporator Operator since 1996
2. Boiler Grate Stoker (With steam capacity 200 t/h press 62 bar ),Turbine Generator & Auxiliary, Operator since 1999
3. Grate Stoker Boiler (with 200T/H steam capacity), Turbine Generator with load capacity 125 MW (2×62,5 MW) , Power Distribution & Auxiliary DCS Operator since June 2000
4. Recovery Boiler, Evaporator, Grate Stoker Boiler, Turbine generator, Diesel Genset (5 x 2,5 MW), Power Distribution & Auxiliary Shift Supervisor since January 2004 untill june,12-2007
5. Team Leader for Coal Captive Power Plant PT.IMM January 2008 to June 2008
6. QA & QC in Power Plant Project PT. Indominco Mandiri Juni 2008 to April 2009 .
7. Head Dept of Coal Captive Power Plant Dept. in PT.Indominco Mandiri-Bontang since july,2-2007 until now
Bontang, October 11-2010
Sincerely Yours,
( Aen Nurhudin )